Main author
Michael BrooksThe Sharp Centre for Design
The Sharp Centre for Design is part of the Ontario College of Art and Design (OCAD). It was created as part of a wider project to allow the college to expand, and can be found in the heart of Toronto, a kilometre north of the famous CN Tower.
It was designed by Alsop Architects in a joint venture with Toronto-based Robbie/Young + Wright. They were selected in 2000, and the $42.5 million construction started in 2002. It was completed in October 2004.
The Sharp Centre for Design is formed by a rectangular structure 26m above the ground, supported by twelve brightly-coloured steel columns, located directly over the oldest building on the Campus. The building was raised above the ground to preserve views of Grange Park through McCaul Street. The free area below the building houses a plaza, providing access to, and an extension of the park.
Its 84m long, 31m wide, 9m high ‘table-top’ form is created by a steel box truss clad in a ‘pixelated’ black and white aluminium skin. This contains two stories of accommodation, including art studios, teaching spaces, meeting rooms, exhibition spaces and offices. It is connected to the existing building by a lift and stair core and sits on twelve 28m-long tapered steel columns supported by reinforced concrete drilled caissons.
You can see a video of the building construction on YouTube.
The completed scheme, whilst more restrained than the original concept designs, has not been without criticism, seen by some as exclusive, and even described by the RIBA as “just a little insane."
In an interview in 2013, architect Will Alsop said, “Very few people say that they like it. And if they don’t like it, they really hate it, and I think that is good. Hardly anybody can remain indifferent about it. But I think it does the job in all sorts of ways. Particularly the inside of the building is received well by the students.”
The Sharp Centre for Design has won a number of awards, including an RIBA international award in 2004, an Excellence Award by Toronto Architecture and Urban Design in 2005, and a Canadian Consulting Engineering Award in 2005.
The project team included:
- Architects: Alsop Architects.
- Local Architects: Robbie Young+Wright Architect.
- Engineers: Carruthers & Wallace Limited.
- Project Manager and main contractor: PCL Constructors Canada Inc.
- Steel Fabricator: Walters Inc.
- Funding: OCAD, benefactors Rosalie and Isadore Sharp (after whom the building is named), and the Ontario province.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.